2021 01 22 DWG Agenda
Hyperledger is committed to creating a safe and welcoming community for all. For more information please visit the Hyperledger Code of Conduct.
Hyperledger is committed to creating a safe and welcoming community for all. For more information please visit our Code of Conduct: Hyperledger Code of Conduct
Announcements
Agenda
- Release status: Pam/Joe: Dashboard: https://jira.hyperledger.org/secure/Dashboard.jspa?selectPageId=10104
- Fabric LTS v1.4.10 and v2.2.2 releases (fixes and minor dependancy updates)
- Fabric CA v1.5 planned for dependency updates (Go 1.15)
- System Channel removal status
- Samples status - Chris/Nik
- Planning to cut 2.3 release branch
- Test Network Sample update for order management API complete (master branch)
- Need to update the Using a Test Network tutorial, create a new tutorial for how to use the order management API with the test network
- Fabric LTS v1.4.10 and v2.2.2 releases (fixes and minor dependancy updates)
- Caliper Documentation improvements
- To update – https://github.com/hyperledger/caliper/tree/gh-pages authored by Nick Lincoln and Dave Kelsey.
- Fabric tutorial: https://hyperledger.github.io/caliper/v0.4.2/fabric-tutorial/tutorials-fabric-existing/
- Blockchain explorer -
- Deployment Guide feedback - Nik
- Prioritize H/M/L/R, where R=normal release doc 2021 Documentation Goals (Theme: Make Fabric easier to use and update)
- Currency/Tech Debt:
- M Prune Jira Backlog
- H Finish system channel remove/update Test network & tutorial
- H Getting Started
- M+ New Add/Remove Raft ordering node tutorial
- H Developing Applications/Commercial Paper Sample
- Content Refresh
- M-L Do we still need 2 Introductions?Rewrite. Community work?
- L Arch Reference topic. Not really ref per se. Significant effort. Move all of it into Ops guides
- M-L Do we still need 2 Introductions?Rewrite. Community work?
- H Encourage users to migrate off of older releases/Deprecation banner on earlier release topics
- H Fabric Documentation Translation Campaign
- H New Deprecations Strategy and Page
- R SDK doc updates for Fabric Gateway
- R Gossip re-architecture could be big.
- R Tokens toolkit
- L Doc more usage with channel management config library && Improved tooling for interactive edit and verification of config blocks
- L Node Backup and Restore - depends on how you deployed. Difft strategies . Fabric needs to do more. What csutomer reqts?
- Currency/Tech Debt:
- Fabric Getting Started PR
- Fabric Translation Campaign Update - David
Discussion
Minutes:
- System Channel removal almost done.
- Need to do FAQ and probably won't do the Migrating from Kafka to Raft kafka_raft_migration.md. It should be removed.
- Configuring and operating a Raft ordering service raft_configuration.md - consider removing and ensuring all content is addressed in a single place in the deployment guide.
- Samples updates - remove from agenda
- Nik brought up the need for more Hyperledger Interoperability between projects such as Indy and Ursa for crypto
- How to get all of these to work together?
- Currently, the projects are silod
- The Community is not structured to support interop.
- Are there specific themes to start with?
- Maybe start a Working group https://wiki.hyperledger.org/#Hyperledger-WorkingGroups for this
- Deployment Guide Feedback - Nik
- Deployed CA/peer/orderer with K8s
- 3 steps to Deployment
- Understand the test network - how the scripts work, the, env variables, etc.
- Read the Deploymennt guide
- Learn k8s - accenture blog post that was helpful https://accenture.github.io/blog/2019/06/25/hl-fabric-meets-kubernetes.html
- Liked the setup of the Deployment Guide overall
- Like the checklists
- Missing
- For the CA, there is a diaspora of docs that could be better aligned.
- Domain name management - example.com vs. difft domains of a real company
- Chaincode: Mounting docker.sock vs.external builder
- Chris Gabriel - Playing around with rust + wasm - containerless and serverless. Will be the future of services like this.
- Fabric translation - David
- video draft
- Script is coming along
- Ready to start working with Translators in coming weeks.