/
2020 01 24 DWG Agenda
2020 01 24 DWG Agenda
Hyperledger is committed to creating a safe and welcoming community for all. For more information please visit our Code of Conduct: Hyperledger Code of Conduct
Announcements
Agenda for this week:
- V2.0 release status: Pam/Joe
- Fabric 2.0 GA: Wed Jan 29
- Cleaned up doc links and references to prior version
- Links to Fabric code - e.g. raft: https://github.com/hyperledger/fabric/tree/master/orderer/consensus/etcdraft
- Fabric 2.0 GA: Wed Jan 29
- New network (BYFN replacement) (Nik)
- New Deployment Guide status (Nik/Joe/Pam)
- MSP Key Concept status (Pam) - Draft tag has been removed. See it here: https://github.com/hyperledger/fabric/pull/307
- Version to version migration (Joe)
Discussion
- V2 release
- Wednesday release date
- Fixing broken doc links
- Still some links to Fabric code to master branch - will be linked using a symbolic variable. One-off activity to use symbolic link
- PR submitted for new docs process. Being merged as no objections!
- Can cherry pick anything that needs to be added to 2.0
- Request for 2.1 dashboard!
- Config updates are only items right now
- Request on fab token
- Comments on pruning and archive
- Move to quarterly releases for 2020
- SDK 2.0 at same time for Java and go. V2 beta for node.js contains with new fabric-admin APIs.
- New test network overview
- Documentation at https://hyperledger-fabric.readthedocs.io/en/latest/test_network.html
- Samples at https://github.com/hyperledger/fabric-samples/tree/master/test-network
- Overview of folder structure
- Quick script walk-through
- Note – this a test network, not production.
- e.g. can use cryptogen or Fabric CA, but e.g. doesn't use a TLS CA
- Walk-through of network commands
- Test network is for V2.0 networks, no 1.x versions.
- Walk-through of Fabric CA for register and enroll. CA for each org
- Created orderer
- Create a channel and then demo multiple channels!
- Doesn't use docker container for CLI
- deploy chaincode, with selected channel
- Will add typescript later, currenlty fabcar go
- Walks through new approval process
- Also demoed Java
- Demos FabCar against test network
- Shows wallet clean up process
- Quick discussion to move CP to network this from basic network
- Confirmed for Jim and Chris that it's in V2.0
- Bonus step to add another org
- and bring down the network
- New deployment guide
- Goal is to replace BYFN.
- 4 different areas, include new deployment guide
- Includes lots of content
- Process overview
- CA commands for TLSCA, RootCA ICA...
- Peer commands
- Ordering Services commands
- Channels etc commands
- Jim discussion on Planning Guide vs Day 2 and operations
- Guidance and consideration. High level "how to".
- Really helps with production adoption
- Check list is a good idea
- Draft PR available soon from Joe!
- YAML files are well documented. Address other issues.
- Jim: Tutorials for CouchDB butnot CouchBase. No proposal for this yet.
- might be worth posing on mailing list?
Video of this week's session at: Recordings
Quarterly reports
Upcoming reports
Backlog
, multiple selections available,
Related content
2020 05 29 DWG Agenda
2020 05 29 DWG Agenda
More like this
2021 02 05 DWG Agenda
2021 02 05 DWG Agenda
More like this
2021-02-09
2021-02-09
More like this
2022-04-20
2022-04-20
More like this
2021-03-09
2021-03-09
More like this
Contributor Meetings 2023
Contributor Meetings 2023
More like this