2024-04-13

2024-04-13

Basic Info

Attendee

Please input your name before the meeting 

Agenda&Minutes

  • PR this week

  • Release plan 1.1.0 Q2 of 2024

    • chaincode (wait till channel can add org):  feng yang will draft a design spec first

      • UI behavior design of chaincode lifecycle: Xichen Pan feng yang 

      • Backend API Design: Yuanmao Zhu 

      • FE Implementation: Code is done. Issue: connect  to  BE.

        • feng yang Xichen Pan will lead. Xiao Ran will continue to work on the OSS project in 2024

        • Xichen Pan has done the dashboard page, split based on operations to let interns join the work. https://github.com/umijs/umi

      • BE Implementation:  ETA 4 PW, yun gu, xiao ran

        • part 1 to test APIs: yun gu will continue and check how many APIs are left.

        • part 2 to fix the implementation.

        • Yuanmao Zhu Xichen Pan will lead. Yun Gu panhaowen789 

        • Yuanmao Zhu will have one API work as a sample, split the work based on APIs to let interns join the work.

      • package, install, approve, commit, invoke/query

  • feng yang :  absent

  • Yuanmao Zhu : absent

  • Xichen Pan : Test the chaincode APIs and fix bugs with xiao ran. caculating package id is supported in hlf v2.4, we can do it by ourselves: 

    the package id of installed package. Calculated by label:SHA256(package), e.g., "testcc_1.0:1f060a1d05b057d98ed98ca8fd57e3a6542d8dfe383aeff64e289718ab851e2b"

  • Xiao Ran : Reading BE code. Chaincode v2 API Spec. Check the Approve API, learn to run fabric peer client.

  • Yun Gu : working on the issue of https://github.com/hyperledger/cello/issues/598, will retry one more week. Will leave the project for his graduation work.

  • panhaowen789 : absent. Will read the implementation of BE to confirm the status.

  • Quarterly report due: https://toc.hyperledger.org/project-reports/. Baohua Yang : https://github.com/hyperledger/toc/pull/223.

  • Intern 2024 submit before Mar 15th: Hyperledger Mentorship Program#2024ProgramDates*. Xichen Pan 

  • Skip April 20/27 and May 4 due to holidays. Let's meet at May 11.

  • feng yang suggest revise the creating peer node API:

    • Only create one peer with the specified name

    • Yuanmao Zhu will help fix the issue

  • feng yang  suggests:

    • When downloading channel config, remove the hint of downloading succeed

    • When creating channel, no need to edit orderer nodes

    • When updating the channel (add an org), why need to input the msp_id? Need to update the steps into docs.

  • Others

    • TODO: update HLF version from 2.2 LTS → 2.5 LTS

      • HLF 2.5.0 is released.

    • TODO: integrate hlf-operator into Cello as the k8s agent.

      • feng yang mentioned that the release-0.9.0-h3c branch may contain some k8s APIs and code