2024-06-15

2024-06-15

Basic Info

Attendee

Please input your name before the meeting 

Agenda&Minutes

  • PR this week

  • Release plan 1.1.0 Q2 of 2024

    • chaincode (wait till channel can add org):  feng yang will draft a design spec first

      • UI behavior design of chaincode lifecycle: Xichen Pan feng yang 

      • Backend API Design: Yuanmao Zhu 

      • FE Implementation: Code is done. Issue: connect  to  BE.

        • feng yang Xichen Pan will lead. Xiao Ran will continue to work on the OSS project in 2024

        • Xichen Pan has done the dashboard page, split based on operations to let interns join the work. https://github.com/umijs/umi

      • BE Implementation:  ETA 4 PW, yun gu, xiao ran

        • part 1 to test APIs: yun gu will continue and check how many APIs are left.

        • part 2 to fix the implementation.

        • Yuanmao Zhu Xichen Pan will lead. Yun Gu panhaowen789 

        • Yuanmao Zhu will have one API work as a sample, split the work based on APIs to let interns join the work.

      • package, install, approve, commit, invoke/query

  • feng yang : https://github.com/hyperledger/cello/issues/602

  • Yuanmao Zhu : absent

  • feng yang : absent

  • Xichen Pan :  working with Xiao Ran for the install issue: https://github.com/hyperledger/cello/issues/621. Run commands with peer cli.

  • Xiao Ran : Reading BE code. Chaincode v2 API Spec. Check the Approve API, learn to run fabric peer client.

    • Install still has issues, will recheck. Xichen Pan help

  • Welcome Haibo Yang: create wiki account, join github id to hyperledger team → cello org. https://github.com/hyperledger/cello

  • Baohua Yang will be absent till mid-July. Xichen Pan will help host the weekly meetings.

  • Quarterly report to TOC: https://toc.hyperledger.org/project-reports/. Q1 report is at https://github.com/hyperledger/toc/pull/223. Q2 report: feng yang 

  • feng yang suggest revise the creating peer node API:

    • Only create one peer with the specified name

    • Yuanmao Zhu will help fix the issue

  • feng yang  suggests:

    • When downloading channel config, remove the hint of downloading succeed

    • When creating channel, no need to edit orderer nodes

    • When updating the channel (add an org), why need to input the msp_id? Need to update the steps into docs.

  • Others

    • TODO: update HLF version from 2.2 LTS → 2.5 LTS

      • HLF 2.5.0 is released.

    • TODO: integrate hlf-operator into Cello as the k8s agent.

      • feng yang mentioned that the release-0.9.0-h3c branch may contain some k8s APIs and code