2022-11-01 Meeting Notes

2022-11-01 Meeting Notes

Date

Nov 1, 2022

Recordings

video recording of this session is not available due to technical reasons

Attendee

  • @VENKATRAMAN RAMAKRISHNA

  • @Dhinakaran Vinayagamurthy

  • @Krishnasuri Narayanam

  • @Sandeep Nishad

  • @竹内琢磨

  • @izuru

Agenda

  • Blog post

    • first figure will be based on:

      • remove list of ledger technologies on right

      • remove 'contract' box for simplicity

      • replace besu with ethereum

      • texts next to ledger icons (full icon)

    • the diagram right above will be removed

    • third (will be second) diagram is ok

    • updated version will be shared to maintainers

  • architecture diagram

    • method names can be replaced with feature name

    • weaver has proof verification function which could be similar to verifyBlock. this needs to be verified. If these are different things, create different box in the figure

    • izuru will show openapi code location in cactus to weaver team

  • cacti migration process

    • rama's suggestion: create weaver directory in cactus repository and move everything to cacti repository

    • disucssion can be continued on discord channel

  • tentative roadmap is here: https://github.com/hyperledger/cactus/pull/2134