Basic Info
Time: 18:00 Every Friday PST (UTC-7)
Please download and import the following iCalendar (.ics) files to your calendar: https://zoom.us/meeting/tJwkc-2oqDgsE9RLmd0AwOltrBhSKjG3jEnp/ics?icsToken=98tyKuCgpz8uGtKWthCHRow-HY-gLPTwpnZdj_pvsBLhUwFETQ_iJMBKAZl1N4vaMeeting links:
Project Wiki Page https://lf-hyperledger.atlassian.net/wiki/display/cello/
In Process issues https://github.com/hyperledger/cello/projects/1#column-6892634
User dashboard API: ;
API-engine API docs: Cello API-Engine API
Agent API:
Add wikipage: https://github.com/hyperledger/cello/wiki/Debug-cello-by-container
Start service workflow is up to date: https://github.com/hyperledger/cello#quick-start
Attendee
Please input your name before the meeting
Agenda&Minutes
PR this week
Release plan 1.1.0 Q3 of 2024
chaincode (wait till channel can add org): feng yang will draft a design spec first
UI behavior design of chaincode lifecycle: Xichen Pan feng yang
Chaincode frontend design: Chaincode Frontend Design: Approved.
Xichen Pan lead the backend API discussion.
Backend API Design: Yuanmao Zhu
FE Implementation: Code is done. Issue: connect to BE.
feng yang Xichen Pan will lead. Xiao Ran will continue to work on the OSS project in 2024
Xichen Pan has done the dashboard page, split based on operations to let interns join the work. https://github.com/umijs/umi
BE Implementation: ETA 4 PW, yun gu, xiao ran
part 1 to test APIs: yun gu will continue and check how many APIs are left.
part 2 to fix the implementation.
Yuanmao Zhu Xichen Pan will lead. Yun Gu panhaowen789
Yuanmao Zhu will have one API work as a sample, split the work based on APIs to let interns join the work.
package, install, approve, commit, invoke/query
feng yang : https://github.com/hyperledger/cello/issues/602, need to add the design spec in sep. On leave today.
Yuanmao Zhu : working on https://github.com/hyperledger/cello/pull/629/files.
Working with Xiao Ran for the install issue: https://github.com/hyperledger/cello/issues/621. Test to run commands with peer cli.
Wait till the migration to HLF v2.5 LTS is done.
Hyperledger Cello Roadmap, will move to github wiki.
feng yang suggest revise the creating peer node API: On leave today
Only create one peer with the specified name
Yuanmao Zhu will help fix the issue
feng yang suggests:
When downloading channel config, remove the hint of downloading succeed
When creating channel, no need to edit orderer nodes
When updating the channel (add an org), why need to input the msp_id? Need to update the steps into docs.
Intern plan: Project Plan - Decentralized Blockchain Network Operation Dashboard
Proposed to let users upload code base to do package.
small size pr, contribution guideline: https://github.com/hyperledger/cello/wiki/Contribution-Process
Anchor peer is a type of updating channel config. Haibo Yang is working on this PR.
haoyu li 2nd year master of UIUC, still reading the docs.
Hyperledger Fabric, Cello (create, operate, use)
Reading code from BE side
Test all backend APIs with haibo's new v2.5 image.
Haoyu will learn HLF's operation lifecycle: https://hyperledger-fabric.readthedocs.io/en/latest/create_channel/create_channel_participation.html#prerequisites.
A good start: NPM to YARN, will rebase to make a PR (docker-compose logs)
Linux Foundation Decentralized Trust (LFDT) Maintainer Days on Oct 21-22 in San Franciscomay attend Oct 21.
Others