Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Basic Info

Attendee

Please input your name before the meeting 

Agenda&Minutes

  • PR this week
  • Release plan 1.0.0 GA  Q1 of 2023
  • Prepare 1.0.0 release
    • QA:feng yangis the QA manager. Will cut 1.0.0-rc1 next week.
      • Xichen Pan  will help update the docs and improve the workflow, too.
    • Documentation Improvement: Yuanmao Zhu will check the docs in repo.
      • Correct the start up workflow
        • Setup: install necessary tools: docker, docker-compose, download hlf docker images, build cello service images;
        • Startup: Register user, then login;
        • Operation: Create a docker agent, create 3 orderer node, create 2 peer, create network, create channel, node join channel;
        • Use chaincode: local install and invoke
  • Baohua Yang will cut a release-v1.0 branch
  • Intern project proposal: A Distributed Smart Contract Management
  • Release plan 1.1.0 Q2 of 2023
    • chaincode (wait till channel can add org): TODO: feng yang will draft a design spec first
      • package, install, approve, commit, invoke/query: 2 pw
      • chaincode upload: org1 upload a zip file, and share it to org2 to upload.
      • org can approve/commit at its dashboard, and see other orgs' approval status.
    • Support customized node name when creating it. feng yang 
    • TODO: integrate hlf-operator into Cello as the k8s agent.
    • TODO: update hlf version from 2.2 LTS → 2.5 LTS
  • No labels