Project Plan - Integrating Substrate Framework with Hyperledger Fabric for Enhanced Interoperability
Dates | Tasks | Deliverables |
|---|---|---|
Jun 12th - Jun 27th | Arranging one-to-one meetings with mentors Writing the project plan and timeline Reviewing on existing interoperability solutions Outlining the initial system design | Project Plan Timeline Initial System Design |
Jun 27th - Jul 18th | Initial deployment of Hyperleder Fabric network. Initial deployment of a Fabric chaincode that handles interoperability. Reviewing on Fabric chaincode design Researching on relays and their role in system architecture. | Implementation of Hyperledger Fabric Implementation of Chaincode(s) Relay-based System Design |
Jul 18th - Aug 29th | Initial Deployment of a Substrate-based network Adding/Writing required modules and pallets to enable interoperability Implementing and deploying relays that interact with Hyperledger Fabric and Substrate network. | A Substrate-based Network Pallets/modules that can interact with one another Relays for interaction with Substrate network |
Aug 29th - Oct 10th | Implementing smart contracts to enable interoperabilitty Evaluting the performance of a transaction made from Substrate to Fabric and vice versa via testing. Assessing and discussing the security, privacy, and scalability of the proposed model. Tackling the potential drawbacks of the design | Hyperleger Fabric and Substrate Smart Contracts Performance Evaluation Security/Privacy and Scalability Evaluation Revised System Design |
Oct 10th - Nov 15th | Integration Test Scaling up the Substrate network | Test Results of System Analysis Scaled Version of Substrate on Various Servers |
Nov 15th - Nov 29th | Result Documentation | Academic Paper Related Documents from System Design to Evaluation |