Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

TimeDeliverables
July 18-25
  •  Mentees intro with mentor, Understanding the Orderer service, and understanding the deliverables.
    Set the developer environment.
    Import the Bdls library and boilerplate the interface implementation.
July 25-31 
  •  Understanding the gRPC. ProtoBuff (Fabric Metadata, message), BDLS theory.
    Define the scope.
August 01-06
  •  Include the protocol to the orderer's main function.
August 07-25
  •  Implement Orderer interfaces.
Q-1 Evaluation  [Aug-11-2023, Aug-14-2023]
  •  Aditya Singh
  •  Deeptonabho Dutta
  •  Santosh Vysyaraju
  •  Tony Mathen
August 28-31
  •  Build Fabric binary/images and debug the orderer data flow. Pushed to SEP-18
September 01-15
  •  Generate/validate blocks. 
  • Midterm Evaluation
September 15-17
  •  Midterm Evaluation
  •  Aditya Singh
  •  Deeptonabho Dutta 
  •  Styvane Soukossi
  •  Santosh Vysyaraju
  •  Tony Mathen
September 18-30catch-up on missing progress. + configtx refactoring / Build Fabric images.
September 18-22
  •  Planning stable infrastructure and performance testing methods.
October 02-27
  •  Collecting data and analysis, including competitor analysis.
Caliper integration or other benchmark.
Q-3 Evaluation  [October -30-2023]
  •  Aditya Singh
  •  Deeptonabho Dutta
  •  Santosh Vysyaraju
  •  Tony Mathen
November 24
  •  Documentation, Unit tests, planning future direction.
Final Evaluation
December 21
  •  Final presentation. Final mentee evaluation.
  •  Aditya Singh
  •  Deeptonabho Dutta
  •  Styvane Soukossi
  •  Santosh Vysyaraju
  •  Tony Mathen

Communication Channel

...