...
Agenda&Minutes
- PR this week
- Release plan 1.0.0 GA Jan of 2023
- user: update (password): 1pw
- Login first time need to do twice, reported by Xichen Pan. feng yang QA
feng yang : token timeout should return to login page, fixed by https://github.com/hyperledger/cello/issues/511;- Redirect code bug: path name is not parsed correctly, will fix soon.
- Token expire duration should be set to 60min. Xichen Pan will fix later.
- Login first time need to do twice, reported by Xichen Pan. feng yang QA
- org is done!
- channel is done: Yuanmao Zhu
download the config block file (peer channel fetch config businesschannel_cfg.block -c ${APP_CHANNEL} -o orderer:7050). config-export → latest config json file: 2pwTODO: Add a download JSON config menu item for the channel.Xichen Panhttps://github.com/hyperledger/cello/pull/507
- Add new org MSP Json into channel. Yuanmao Zhu
https://github.com/hyperledger/cello/pull/490TODO: Add a button + upload-file dialogueXichen Panwill help this:https://github.com/hyperledger/cello/pull/508
- Xichen Pan found the FE has a delete-channel menu item, which should be removed.
- node is done: Xichen Pan
create(docker create),start(stopped-->running),stop (stop the container), delete(delete the node own info from DB),restart (docker restart);query(show node information from its uuid),download/update(config file: core.yaml for peer, orderer.yaml for orderer)TODO: need feng yangto help add menu items to download/upload. Xichen Panwill fix this soon!https://github.com/hyperledger/cello/pull/492
- Peer join channel. Upload a genesis block file of the channel (peer join channel with the genesis block of the channel: peer channel join -b ${APP_CHANNEL}.block) : 1pw
backend API is done: https://github.com/hyperledger/cello/pull/489
- Enhancement: Yuanmao Zhu
- Check node status before sending request to it
- user: update (password): 1pw
- Release plan 1.1.0 Q1 of 2023
- chaincode (wait till channel can add org): TODO: feng yang will draft a design spec first
- package, install, approve, commit, invoke/query: 2 pw
- chaincode upload: org1 upload a zip file, and share it to org2 to upload.
- org can approve/commit at its dashboard, and see other orgs' approval status.
- chaincode (wait till channel can add org): TODO: feng yang will draft a design spec first
- Prepare the 1.0-GA and feng yangis the QA manager.
- Documentation Improvement: Yuanmao Zhu will start to review.
- https://github.com/hyperledger/cello/issues: Baohua Yang will review and close expired.
- Cancel next two weeks (Jan 21, 28) due to holidays.
- Backlogs:
- zhao shihong: https://go.dev/doc/install
- https://go.dev/dl/go1.16.15.linux-amd64.tar.gz
rm -rf /usr/local/go && tar -C /usr/local -xzf go1.17.8.linux-amd64.tar.gz
export PATH=$PATH:/usr/local/go/bin
- qiang xu is working on the API Engine implementation
- Dixing Xu is working on using sdk to let user-dashboard to operation channels and chaincode;
- Xuqiang used free tools to create Front end model:https://modao.cc/app/658be913a206443efed5b9e0b56653b228ea1211?simulator_type=device&sticky.
- TODO: feng yangto have a look.
- zhao shihong: https://go.dev/doc/install